User Tools

Site Tools


group_project_committee

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
group_project_committee [2007/06/10 01:09]
don
group_project_committee [2010/01/01 22:28] (current)
Line 4: Line 4:
   * [[Group Project Ideas]]\\   * [[Group Project Ideas]]\\
   * [[Past LLC Group Projects]]\\   * [[Past LLC Group Projects]]\\
 +
  
  
Line 21: Line 22:
    
 __**Timeline Overview**__ __**Timeline Overview**__
-  * Each group will be required to meet with the Group Project Committee and  submit a proposal. ​ These meetings will be scheduled by each group and need to be completed by November 15, 2006.+  * Each group will be required to meet with the Group Project Committee and  submit a proposal. ​ These meetings will be scheduled by each group and need to be completed by November 15, 2007.
  
   * The project needs to be completed by the time the class graduates in May.  ​   * The project needs to be completed by the time the class graduates in May.  ​
group_project_committee.txt ยท Last modified: 2010/01/01 22:28 (external edit)